Sequoia Century Worker's Ride (200k), June 2005 | 39/54 | Pipeline Rd. northbound before dropping into the Park HQ Area (590ft)

Previous | Next

../mediafiles/l39.jpg

2005/06/11 13:05:07


Metering Mode: center weight
Exposure time: 0.0063 s (1/160)
Aperture: f/2.8
Focal length: 7.4mm (35mm equivalent: 37mm)
Flash: No
File size: 1648558 bytes

Pipeline Rd. northbound before dropping into the Park HQ Area (590ft)


Previous | Next