Go back to Bike Picture Albums 2005 | Sequoia Century Worker's Ride (200k), June 2005
<<  Page 1 2 3 4 5 6 7 8 9  >>
Chuck at the Corralitos Rest Stop at the fire station (320ft) Bill in Corralitos (272ft) Slide on Valencia Rd., Aptos (140ft)
Chuck at the Corralitos Rest Stop at the fire station (320ft)
2005/06/11 11:08:23
Bill in Corralitos (272ft)
2005/06/11 11:12:03
Slide on Valencia Rd., Aptos (140ft)
2005/06/11 11:40:52
Houses on the receiving end of the slide. Soquel Drive, Aptos (100ft) Soquel Drive, Aptos (90ft)
Houses on the receiving end of the slide.
2005/06/11 11:41:13
Soquel Drive, Aptos (100ft)
2005/06/11 11:44:43
Soquel Drive, Aptos (90ft)
2005/06/11 11:45:03

Click on a picture to enlarge it.

<<  Page 1 2 3 4 5 6 7 8 9  >>
2005/June/17
Generated by Galerie