Go back to Bike Picture Albums 2005 | East Bay Ride, October 2005
Apartments on Old Tunnel Rd. (820ft) Saxophone house on Old Tunnel Rd. (890ft) The group reaches the high point on Grizzly Peak Rd. (1670ft) Bear Creek Rd.; view backward of Vollmer Peak (1905ft) while climbing
Apartments on Old Tunnel Rd. (820ft)
2005/10/1 10:08:49
Saxophone house on Old Tunnel Rd. (890ft)
2005/10/1 10:10:38
The group reaches the high point on Grizzly Peak Rd. (1670ft)
2005/10/1 10:41:05
Bear Creek Rd.; view backward of Vollmer Peak (1905ft) while climbing "Papa Bear" (850ft)
2005/10/1 12:02:48
Marius climbing past the refineries on San Pablo Rd. (70ft) Refinery smokestacks on San Pablo Rd. (80ft) Zampa Bridge over the Carquinez Straight from San Pablo Rd. (180ft) Marius reaches the top of McEwen Rd. (650ft)
Marius climbing past the refineries on San Pablo Rd. (70ft)
2005/10/1 13:03:30
Refinery smokestacks on San Pablo Rd. (80ft)
2005/10/1 13:03:53
Zampa Bridge over the Carquinez Straight from San Pablo Rd. (180ft)
2005/10/1 13:11:25
Marius reaches the top of McEwen Rd. (650ft)
2005/10/1 13:40:59

Click on a picture to enlarge it.

2005/October/2
Generated by Galerie